June 27, 2025: Update on our ongoing projects and other miscellaneous items.
Pool Heaters
The contractor has all materials and venting parts ready for installation. They are waiting for the permit to be issued by the City of Miami Beach. The City’s system shows a scheduled permit issuance date of June 23, 2025. As of June 27, the permit has not been issued yet.
Transfer Switch Control Panel
The transfer switch control panel was successfully installed last week. To finalize the permit, we have obtained a proposal for an engineer to prepare the revised drawings and calculations. We are waiting to obtain at least a second proposal prior to approving the engineer’s work. The board approved a proposal to connect the controls with the fire pump. Installation should occur next week
Elevator Repairs
Repairs have been completed and an inspection from the City of Miami Beach was conducted on June 16.
The City granted a one-month extension for the current violation. As soon as the controllers are connected to the fire pump, testing of the transfer switch with the elevator can be performed. Once testing is performed and is successful, the violation will be lifted
Concrete Restoration
The board met with the Attorney. TT has billed the association over $120,000 for a six-month period. The attorney advised that, from a preliminary analysis, the association owes TT around 40K. Because of such a discrepancy, the attorney advised moving forward with a new engineer since negotiation for the billing dispute can take a while.
The board has found a new engineering firm to take over the project.
The firm is called YHCE. The board is reviewing the contract with our attorney.
The proposal can be found in this folder: Resident Resources/files/40-YEARS RECERTIFICATION/YHCE engineering
The attorney issued a letter to the association regarding the alleged conflict of interest and billing concerns that unnecessarily elevated to involve the Association Attorney.
The Letter can be found in this folder: Resident Resources/files/40-YEARS RECERTIFICATION/00 Thornton Tomasetti Engineering/2025_0627 Letter from Attorney…
Roof
Final inspection was conducted by the City on June 16 and it passed.
The roof permit and the mechanical permits are being closed.
Final inspection on June 26 did NOT pass for the mechanical permit. We are waiting to hear from the contractor what needs to be done to pass final.
Financials
The March and April financials are now available in the resident resources section. We do not have May’s financials yet
Gazebos
We have received a sample of the wood color material for the replacement of the gazebo floors. This sample will be available for review at the upcoming meeting, where we will solicit owner feedback and comments.
Management Position
The Board has hired a new manager and she will start working on July 7. Her name is Dina, her annual salary is $80,000.
The Board will organize a meeting with the unit owner to introduce the new manager.
Improvements to Common Areas
- Carpet Cleaning is completed
- Lobby painting: We are collecting a third proposal prior to move forward.
- Basement pumps: The sump pumps in the basement are scheduled to be replace on June 24, 2025
Impact Windows
Impact Doors for the Gym and lobby area were delivered to AG, and the installation of the same will commence next week
as per AG notification on June 17, 2025.
The contractor is waiting for the city to issue the permit. As soon as the permit is ready, the contractor will proceed with the installation
AC common areas
We obtained a 2nd estimate and contacted a third company for the last estimate needed to make a decision
They will be discussed at the next meeting with the owners
Basement pumps
Two new pumps have been installed this week.
We look forward to seeing many of you at the meeting during the week of [tbd]. Your feedback and participation are essential as we work together to make Oceanfront Plaza a first-class residence for all owners and guests.